This is the progress timeline of the SARISTU project, which presents a brief listing of SARISTU’s ongoing progress. To explore the timeline you may use your mouse or the left/right arrow keys in your keyboard to slide across different time periods. You may also change the display between “3D” and “2D” by clicking on the according buttons. Every time you wish to read a story in the timeline, click on it in order to enlarge it.

Start Date: 01/09/2011;xNLx;End Date: 31/08/2015;xNLx;

2015-01-07 14:35:30

AS09 Stringer manufacturing

Stringer manufacturing (in total 6 stringers, 3 with CNT, 3 without) completed

2015-01-09 03:20:47

IS13 (WP133) Door Surround Structure

Assembly of DSS ongoing. Normal frames and couplings have been fastened

2015-01-16 14:35:30

AS04 Subcomponents

All subcomponents for testing have now been manufactured. Sensors for AS07 currently being sensorized

2015-01-16 14:35:30

AS01 Ground Test Demonstrator Assembly

Manufacturing of the spar for ground testing has been completed. Quality testing has been passed

2015-01-19 09:24:45

AS01 Enhanced Adaptive Droop Nose Ground Test Demonstrator Assembly

Excellent fit of ground test skin to assembly mock-up

2015-01-21 09:24:45

AS02 Advanced Trailing Edge Device

ATED attached to IS12 Wind Tunnel Demonstrator including functionality test

2015-01-21 14:35:30

IS13 (WP133) Door Surround Structure

Normal frames successfully installed

2015-01-23 09:24:45

AS03 Winglet

Winglet attachment to IS12 Wind Tunnel Demonstrator in progress including functionality test.

2015-01-23 14:35:30

AS10 Conductive CFRP: Flat specimen

All flat specimen, doped and non-doped, ready for shipment.

2015-01-23 14:35:30

IS13 (WP135) Side panel

AGI-F (Suresnes) receiving chassis parts ready for electrical testing

2015-01-26 22:34:43

6th issue of the EASN Newsletter

6th issue of the EASN Newsletter

2015-01-28 09:24:45

IS12 Wind Tunnel Demonstrator

Winglet, lower and upper panel had all been mounted in previous weeks but have been removed to complete internal system installation work

2015-02-04 03:20:47

AS08 Durability test

14 Samples for pre-qualification tests are currently impacted at A-F (prior durability tests) (Primer + Cu-based piezochromic pigment and Temporary paint + Co-based piezochromic pigment) Durability tests have started at A-F on small samples with CAT µcapsules, CNRS piezochromic pigments into primer and temporary paint.

2015-02-04 03:20:47

IS12 Ground test demonstrator

Positioning of the piezo sensors on the lower panel of the ground test demonstrator completed

2015-02-06 08:05:00

AS05 Ground test demonstrator

Sensors positions map on the lower wing panel of the second wing box demonstrator is in finalization.

2015-02-06 09:24:45

IS13 (WP133) Door Surround Structure

Assembly of DSS is progressing well. Approximately 50% of cable bundles attached

2015-02-06 09:24:45

AS09 Sub-element test

Infused and co-cured sub-element test performed to fix the support distances based on support length

2015-02-13 08:05:00

AS01 Enhanced Adaptive Droop Nose Ground Test Demonstrator Assembly

Ground test EADN with auxiliary spar, actuator and controller shipped to VZLU for assembly. Heater-mat power supplies shipped to VZLU. Assembly of test rigs and EADN at VZLU ongoing.

2015-02-20 03:20:47

AS06 Impact analysis

Impact analysis of DLR panel validated PoD concept for impacts in the skin

2015-02-20 03:20:47

IS12 Wind Tunnel Demonstrator

Wing Wind Tunnel Demonstrator nearing completion

2015-02-25 03:20:47

IS13 (WP133) Door Surround Structure

DSS assembly, cable installation and sensor checks completed

2015-02-27 03:20:47

IS13 (WP134) Lower panel

CNT doped panel manufactured without issues

2015-02-27 03:20:47

AS08 Durability test

Samples containing pigments and capsules for durability tests prepared by ADS and sent to EADS-F

2015-02-27 03:20:47

AS06 End of Scenario meeting

End of Scenario meeting held at INVENT in Brunswick where the first Acousto Ultrasonic image of the Door Surround Structure with a dummy mass to be detected was successfully captured

2015-03-02 03:20:47

AS02 Wind Tunnel Demonstrator

Ahead of Wind Tunnel Demonstrator box closure, the AS02 team dedicated the “Kinematic rib based structural systems for innovative adaptive trailing edges” to our colleague Kristina Ditzel in a ceremony at ALA Pomigliano.

2015-03-02 03:20:47

IS12 Wind Tunnel Demonstrator

Wing Box closed, removable fairings dismounted for fitting into transportation jig ahead of shipment

2015-03-04 03:20:47

IS13 (WP133) Door Surround Structure

Door Surround Structure “flying” from Invent in Brunswick to DLR in Stade: Ready for testing

2015-03-06 03:20:47

AS01 Ground Test Demonstrator Assembly

Ground Test Demonstrator Assembly near completion on Test Stand

2015-03-06 03:20:47

IS12 Ground test demonstrator

All Ground Test Demonstrator parts except ribs are now available at ALA.

2015-03-08 03:20:47

SARISTU in SPIE Smart Structures/NDE conference 2015

N.Testoni (UNIBO), L. De Marchi (UNIBO), A. Marzani (UNIBO), 2015. Spira Mirabilis: a shaped piezoelectric sensor for acoustic events localization.Proceedings of the SPIE Smart Structures/NDE Conference 9435, Sensors and Smart Structures Technologies for Civil, Mechanical, and Aerospace Systems 2015, 27th of March, 2015, San Diego, USA. (doi:10.1117/12.2086474).

2015-03-09 03:20:47

AS09 CFRP Toughening using CNT's

ILSS strength results (mean: 90MPa undoped, 107MPa CNT doped) available with data analysis for modulus ongoing.

2015-03-09 03:20:47

AS01 Static test of the Enhanced Adaptive Droop Nose

The static test of the EADN successfully took place at VZLU in Prague. Full droop applied ahead of bending with measurements in line with predictions. Heating was applied with a very small effect on actuation forces.

2015-03-10 03:20:47

SARISTU in SPIE Smart Structures/NDE conference 2015

N.Testoni (UNIBO), L. De Marchi (UNIBO), A. Marzani (UNIBO), 2015. A coin sized, 40mW, 20 grams sensor node for guided waves detection. Proceedings of the SPIE Smart Structures/NDE Conference 9435, Sensors and Smart Structures Technologies for Civil, Mechanical, and Aerospace Systems 2015, 27th of March, 2015, San Diego, USA. (doi:10.1117/12.2084817).

2015-03-12 03:20:47

SARISTU in SPIE Smart Structures/NDE conference 2015

E. Monaco (UNINA), V. Memmolo (UNINA), F. Ricci (UNINA), N. D. Boffa (UNINA), L. Maio, 2015. Guided waves based SHM systems for composites structural elements: statistical analyses finalized at probability of detection definition and assessment. Proceedings of the SPIE Smart Structures/NDE Conference 9435, Sensors and Smart Structures Technologies for Civil, Mechanical, and Aerospace Systems 2015, 27th of March, 2015, San Diego, USA. (doi:10.1117/12.2084334).

2015-03-16 03:20:47

IS13 WP134: Lower panel

101 cleats and first frame shipset completed and ready for shipment

2015-03-18 03:20:47

IS12 Wind Tunnel Demonstrator

The Wind Tunnel Demonstrator experienced its “maiden flight” to TsAGI on board flight RU306 on 18.03.2015. Customs issues under clarification.

2015-03-20 03:20:47

IS12 Ground test demonstrator

Acoustic monitoring sensor localization completed for lower panel

2015-03-23 03:20:47

IS13 WP133: Door Surround Structure

Manufacturing closure meeting held at DLR in Stade with the DSS.

2015-03-23 03:20:47

AS07 Multi Site Damage Detection and Assessment

Batch #3 Test series analysis show very good correlation between simulation and experiment

2015-03-27 03:20:47

IS12 Wind Tunnel Demonstrator

Customs clearance for wing delivery occurred on 27.03.2015, with the wing having arrived at TsAGI on 30.03.2015.

2015-04-01 03:20:47

SARISTU in Composite Part B Journal

A. Airoldi (POLIMI), A. Baldi (POLIMI), P. Bettini (POLIMI), G. Sala (POLIMI), 2015. Efficient Modelling of forces and local strain evolution during delamination of composite laminates. Composite Part B, Vol. 72, April 2015, pp. 137-149, 2015.

2015-04-06 12:03:14

IS13 (WP135) Frames

WP135: Frames are en route from FACC to SAAB

2015-04-20 03:20:47

AS07 Multi-SHM equipped test panel in ICL test stand

Testing of both SHM equipped panels ongoing. Damages appear to be detectable by all 3 SHM techniques implemented.

2015-04-20 03:20:47

IS13 (WP134) Compression Test panel

WP134 Compression Test panel in Assembly at TAI

2015-04-20 03:20:47

AS01 Bird Strike Test on EADN

The Bird Strike test has been conducted with the bird strike protection structure having performed as expected.

2015-04-22 03:20:47

IS13 (WP135) Electrical test panel

WP135 Electrical test panel in Assembly at SAAB

2015-04-24 03:20:47

IS12 Wing Wind Tunnel Demonstrator

The Wind Tunnel Demonstrator in preparation for the Ground Vibration Test at TsAGI

2015-05-01 02:55:28

AS02 Track of the AS02 demontrator and relevant instrumentation trip

Track of the AS02 demontrator and relevant instrumentation trip to Tsagi. Mission to Tsagi (CIRA). Control chain check including actuator and sensor system verification, following previous activities in Alenia. Functionality verification: shape and differential actuation check. Calibration tests. Flutter expansion.

2015-05-01 03:20:47

IS13 WP134 (Lower Panel): final frame shipset is complete

WP134 (Lower Panel): Machining of the final frame shipset is complete.

2015-05-01 04:42:19

AS08 Demonstrators have been prepared

Demonstrators have been prepared for painting with primer and peelable paint loaded with piezochromic pigments.

SARISTU

Launch
Copy this timeline Login to copy this timeline 3d Game mode

Contact us

We'd love to hear from you. Please send questions or feedback to the below email addresses.

Before contacting us, you may wish to visit our FAQs page which has lots of useful info on Tiki-Toki.

We can be contacted by email at: hello@tiki-toki.com.

You can also follow us on twitter at twitter.com/tiki_toki.

If you are having any problems with Tiki-Toki, please contact us as at: help@tiki-toki.com

Close

Edit this timeline

Enter your name and the secret word given to you by the timeline's owner.

3-40 true Name must be at least three characters
3-40 true You need a secret word to edit this timeline

Checking details

Please check details and try again

Go
Close